PRE OPEN DAY
A selection of photos from March and April 2023. Our first months were spent rediscovering the old trails and bringing them back to their former glory. We also completed Treacle Tart as this trail was started but never completed by the previous owners.
HOOTERS REBUILD
Our first big project after reopening was to revamp Hooters. We started by redesigning the first section of trail taking out the old whoops and putting in a step down booter, then dug out the original berms to give them back their shape, plus added a new shark fin and a wooden down ramp and dirt landing on the log drop feature. A huge thanks goes out to our dig team for their hard work and efforts on this build.
STOP, DROP AND ROLL BUILD
This trial was originally built for the final round of Edg’duro 2023. It was clear that people really loved the track and so we decided to make some changes and integrate it into our normal trail network. It consists of a selection of drop offs and step down gaps that wind their way through the natural woodland terrain.
RECEPTION AND SHOP REFIT
One of our 2023 winter projects has been to improve the reception cabin and incorporate a dedicated shop area. As well as this, we have completed exterior cladding on the outside of the building to improve the aesthetic as well as incorporate a bike wash area at the rear of the building.